Quick Inquiry

Drag

Project Highlights

91 Maginficent

Bungalows

90 Shops For Your

Convenience

30+

Amenities

Views

Amenities

Indoor Games

Banquet Hall

Gym

Children Play Area

Theater

Senior Citizen Sit Out

CCTV Camera

School Drop-off

Sandpit

Party Lawn

Tree Plantation

Entrance Gate

Gazebo

Swanky Street Lights

Modern Bathroom

Best Quality Construction

Layout & Plans

Specifications

  • A full body vitrified tiles in all rooms.

  • Multicolored paved parking.

  • Full body vitrified tiles/glazed tiles on toilet floor and dado till lintel level.
  • Premium brand sanitary ware and fittings.

  • Reinforced concrete flat roof with integral waterproofing and insulation properties, finished with china mosaic or equivalent in top.

  • Heavy aluminum section in all external opening with silicon sealant.
  • Flush doors with laminates or paint on both sides.

  • Finish outside: External wall finished with apex paint.
  • Finish inside: Internal wall finished with putty.

  • Concealed copper wiring with sufficient point as per architect's details.

  • Hard landscape and soft landscape development in net plot area and common area.

Onsite Updates